Ara mostrant els elements 81-90 de 104
Díaz Alvarado, Sergio Alberto (Data de defensa: 2017-09-18)
The main objective of this thesis is the probabilistic assessment of the expected seismic damage in steel buildings located in Mexico City. Although a deterministic analysis is performed both, seismic ...
Gómez Ramió, Júlia (Data de defensa: 2015-07-08)
Antoni Gaudí developed, for the pinnacles ofthe Sagrada Famí!ia, a unique constructive solution with precast concrete elements which were slightlyreinforced and covered with a trencadís ofMurano glass ...
Caro Camargo, Carlos Andrés (Data de defensa: 2016-01-25)
Distributed hydrological modeling occurs as a historical consequence of the different developments and advances in conceptual hydrology, first, through deepening and adaptation of hydrology through ...
Levatti, Hector Ulises (Data de defensa: 2015-04-28)
This thesis focuses on the experimental and numerical study of the desiccation processes of low-plasticity clayey soils that usually result in shrinkage and often in cracking. A comprehensive state of ...
Yamin Lacouture, Luis Eduardo (Data de defensa: 2016-01-28)
The probabilistic seismic risk assessment in terms of economic losses for building portfolios aims at the estimation of the probability distribution functions of losses. This can be done for a specific ...
Zambrano Nájera, Jeannette (Data de defensa: 2015-04-09)
Huge modifications have been made to landscape or urban watersheds, especially in twentieth century, caused by increases in urbanization have led to progressive increases in runoff flows and therefore ...
Mora Cuevas, Miguel Genaro (Data de defensa: 2016-02-02)
In the situation to make decisions about which risk mitigation measures -RMM- to implement and the performance level required, arises the need for a quantitative analysis of benefits that may be obtained ...
Herrera Gonzalez, Reyes Indira (Data de defensa: 2017-03-31)
In this research, the seismic response, the vulnerability and the expected damage in rein-forced concrete residential buildings, with irregular plants, are analyzed. This irregularity is mainly due to ...
Martín Cañizares, María del Pilar (Data de defensa: 2015-11-16)
Building a high-speed line requires significant investment and its design strongly influences the operation, with the aggravating circumstance that subsequent modifications not initially planned are not ...
Estrella Toral, Soledad (Data de defensa: 2013-10-17)
Tradicionalmente la construcción de aliviaderos escalonados en presas de hormigón compactado con rodillo (HCR) se caracteriza por la presencia de muretes guías que imponen un ancho constante a lo largo ...