Pujadas Gispert, Ester (Date of defense: 2016-02-01)
Room module buildings have been the subject of extensive literature, but few buildings have actually been built. However, the numbers are now high enough to carry out an on-site analysis, in orde rto ...
Caballero Gómez, Alberto Adán (Date of defense: 2016-06-17)
The process of control of a construction project involving the whole life cycle is a complex task. The version of control of a project on the basis only of the execution of the work is a limited version, ...
García Díaz, Yineth Paola (Date of defense: 2023-09-27)
(English) A comprehensive evaluation of various industrial and urban by-products was conducted to determine their potential as precursors for alkali-activated materials (AAM) in Spain. Over 15 by-products ...
Muñoz La Rivera, Felipe (Date of defense: 2023-03-28)
(English) Cycles in the construction sector and economy disguise what appears to advance in occupational risk prevention when, unfortunately, the AECO sector maintains very high accident rates. The zero ...
Soltanalipour, Milad (Date of defense: 2023-05-10)
(English) Composite structures are frequently used in the construction of high-rise buildings due to their high ductility and strength. This article-based doctoral thesis has multiple objectives related ...